Proposed Transportation Projects

Print
Press Enter to show all options, press Tab go to next option

Statewide Transportation Improvement Program (STIP)

STIP_ImageAnnually, the Nevada Department of Transportation (NDOT) develops a Statewide Transportation Improvement Program (STIP) covering all areas of the state. The STIP is the instrument used to implement the plans resulting from the statewide transportation planning process. NDOT administers and implements programs for the planning, development, construction, and operation of the state's transportation system.

NDOT's mission is to efficiently plan, design, construct and maintain a safe and effective seamless transportation system for Nevada's economic, environmental and social needs. The transportation planning process sets the stage for fulfilling this mission by balancing needs with limited resources. The planning process sets long-range funding strategies statewide, and the transportation needs identified are used in developing a financially constrained STIP.

FFY16-FFY19 STIP Project List

The Nevada Department of Transportation recently completed the new Electronic Statewide Transportation Improvement Program (eSTIP) and all projects for the FFY2016-FFY2019 can be found here:

FFY18-FFY21 Draft STIP 

The FFY18 STIP is currently in draft form:

FFY18 Draft STIP

FFY18 Draft STIP Process

FFY18 Certifications 

 Should you have any public comment please provide it via the contact information at the bottom of this page.

NDOT Work Program

NDOT's Work Program lists transportation projects than NDOT intends to work on during the current fiscal year and a complete list of projects can be found here:

The Work Program satisfies Nevada Revised Statute (NRS) 408.203 requiring the Director of NDOT to submit a three and 10 year list of transportation projects to the State Legislative Council Bureau (LCB) every even year, and the State Legislature every odd year.

Projects in the Work Program are sorted by county with each of the 17 counties represented with its own section and a section for the Tahoe MPO (TMPO).

The Work Program is composed of three elements:

  • The Work Program (WP) lists the current fiscal year projects to include the betterment and rehabilitation projects completed by state forces and district contracts.
  • The Short Range Element (SRE) lists projects state and local entities would like to initiate within the next 2 to 3 years.
  • The Long Range Element (LRE) lists projects in the planning stage or extensions of current projects to be completed in 4 to 10 years.

FFY18 DRAFT Work Program

The FFY18 Work Program is currently in draft form:

FFY18 Draft Work Program  

Should you have any public comment please provide it via the contact information at the bottom of this page.

If you have any questions regarding the STIP or the Work Program, please contact the Program Development Office by phone, fax, email or mail:

Program Development Office

Nevada Department of Transportation
1263 South Stewart Street
Carson City, Nevada 89712
Phone: 775-888-7121
Fax: 775-888-7105
Email: jspencer@dot.nv.gov

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer