Show/Hide

Materials Sampling and Testing Frequencies

Print
Press Enter to show all options, press Tab go to next option

Minimum Required Samples and Tests

The NDOT Construction Division requires that every material incorporated into the project must be tested and accepted based on a sampling frequency for testing in order to ensure that quality materials are incorporated into the work and to meet federal requirements. These frequencies have been established based on what is necessary to help ensure consistency of the material quality.

Project

Independent Assurance (IA)

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer