News Releases

Print
Press Enter to show all options, press Tab go to next option
 
searchsettings

Initial ATM Sign Activation Begins February 10 in Las Vegas Valley

Post Date:02/05/2020 12:59 PM

LAS VEGAS, NEV. –The Nevada Department of Transportation (NDOT) will partly activate the Active Traffic Management (ATM) freeway signs effective 9 a.m., February 10, in the Las Vegas valley. Forty-two ATM signs were installed along north and southbound Interstate 15 between Russell Road and Washington Avenue as well as along U.S. Highway 95 between Valley View and Las Vegas boulevards as part of Project NEON.

Starting Monday, motorists will notice digital speed limit signs to the right side of the ATM truss structures, along with lit High Occupancy Vehicle (HOV) signs to the left. Both signs are fully lawful and enforceable traffic controls. Should the signs go dark, the enforced speed limit reverts to the last posted static speed limit sign.

Once testing is complete, the full-color LED overhead signs will provide next-generation, real-time driver information about planned and unplanned incidents, speed limit changes, and lane use control, thereby improving safety and traffic flows by reducing differential travel speeds and the likelihood of secondary crashes for enhanced operational efficiency. The entire ATM sign network is anticipated to be fully operational by the end of the first quarter of 2020.

NDOT works with Waze to inform the public about planned highway restrictions, but unscheduled construction changes, closures and restrictions are possible due to weather or other factors. For the latest state highway conditions, visit nvroads.com or call 511 before driving.

ATM System_New

Return to full list >>
searchsettings