Show/Hide
exclamation mark

D1 State Route 160 โ€“ Blasting east of Mt. Potosi is scheduled to resume Friday, Oct. 19. The road will close at 12:45 p.m. and the closure could last up to two hours. Please check back here for new notifications.

Click Here for More Details

News Releases

Print
Press Enter to show all options, press Tab go to next option
searchsettings

I-15 SB / Charleston Off-Ramp Closed for 6 Weeks Starting Monday in Las Vegas

Post Date:01/11/2018 2:13 PM

LAS VEGAS, NEV. โ€“ The Nevada Department of Transportation (NDOT) will close the Interstate 15 southbound to Charleston Boulevard off-ramp in downtown Las Vegas from 6 a.m., January 15, until 6 a.m., March 6, 2018. The ramp closure is needed to construct the new Charleston Boulevard off-ramp as part of Project Neon โ€“ a nearly $1 billion 3.7-mile-long widening of Interstate 15 from the Spaghetti Bowl interchange to Sahara Avenue. Kiewit Infrastructure West Co. is the design-build general contractor, with Atkins North America as lead designer.

Motorists should use caution while travelling through the work zone, heed construction signage, and take alternate detour routes, if possible. Check the Project Neon website (NDOTProjectNeon.com) or Facebook, LinkedIn, and Twitter pages (@NDOTProjectNeon) for up to date information. There is also a free smart phone app available, plus a hotline available in both English and Spanish at: 702-293-NEON (6366). NDOT works to inform the public about planned highway restrictions, but unscheduled construction changes, closures and restrictions are possible due to weather or other factors. For the latest state highway conditions, visit nvroads.com or call 511 before driving.

I-15 SB Charleston Exit Closure

Return to full list >>
searchsettings