District 1 Construction Report


When traveling through construction zones, motorists should observe posted speed limits and watch for construction personnel and equipment.

All Information Subject to our Use Disclaimer
Last Updated: 2/8/2010 9:47:44 AM

I-15 Design Build SouthContract - I-15 South, Blue Diamond Road to Tropicana Avenue Design Build Project.
Contract 3366 - Las Vegas Paving Corporation - $246,500,000.
Improve the I-15 corridor from Tropicana Avenue to Silverado Ranch Road. Relieve congestion and improve traffic flow in the I-15 corridor in response to continued growth in the Las Vegas Valley.
Project Start: February 2010 Estimated Completion: March 2012
On I-15 northbound the right travel lane at I-215 and the I-215 westbound to I-15 Northbound ramp will be closed to set Temp barrier rail, Monday and Tuesday evenings, February 8 and 9 from 9:00 p.m. to 5:00 a.m.Motorists are advised to use lane shifts as directed.

.

HEIGHT RESTRICTION ALERT: The I-15 northbound ramp and Las Vegas Boulevard on-ramp to CC-215 westbound will have a height restriction of 15' 6". Over-height traffic will be routed to I-15 north to Russell Road, to I-15 southbound to the CC-215 west bound ramp. This height restriction will be in place from March 30, 2010 through August 9, 2010.

I-15 Express Lane Project I-215 to Sahara Avenue
Contract 3355 - Capriati Construction Corp., Inc. - $21,516,293.69
Construction of a portion of I-15 from I-215 to the Sahara Interchange, approximately 5.72 miles. Widening from 8 to 10 lanes.
Project Start: Sep 15, 2008 Estimated Completion: Nov 2009
On I-15 from the UPRR Bridge Structure nead Industrial to I-215 two express lanes in each direction are now operational. Construction continues on the new bridge over the UPRR and is expected to be complete this Spring. Motorists are advised to use lane shifts as directed, use caution in the work zone.

Industrial Road is reduced to one lane of travel in each direction under I-15 through February.

I-15 Design Build Project - I-15 Widening from the I-15/US 95 Spaghetti Bowl Interchange to Craig Road
Contract 3313 - North Corridor Constructors - $240,000,000.00
Improve the I-15 corridor from the I-15/US 95 "Spaghetti Bowl" interchanges to Craig Rd. in North Las Vegas. The project's purpose is to relieve congestion and improve traffic flow in the I-15 corridor in response to continued growth in the Las Vegas Valley.
Project Start: September 2007 Estimated Completion: Fall 2010
US 95 Landscaping and Aethetics Project
Contract 3391 (ARRA) - Valley Crest Landscaping Development, Inc. - $3,115,684.58
Landscaping and aesthetics along US 95 from Martin Luther King Boulevard to the Rainbow Interchange.
Project Start: September 28, 2009 - Estimated Completion: August 2010
No impact on traffic at this time.

SR 564 Lake Mead Parkway widening
Contract No. 3390 - Las Vegas Paving Corp.,$13,543,210.00.
Construction of a portion of the Urban Highway System in Clark County, Nevada, on Lake Mead Pkwy(SR 564), from Boulder Highway(SR582) to Lake Mead National Recreation Area and SR 564, Lake Mead Pkwy, from Boulder Highway(SR582) to Ash Street.
Project Start: January 2010 Estimated Completion: Fall 2010
Various lane closures may be in effect on Lake Mead Parkway between Boulder Highway and the Lake Mead Recreation Area Sunday through Thursday evenings from 9:00 p.m. to 5:00 a.m. Motorists are advised to use lane shifts as directed.

Culvert work will take place adjacent to Lake Mead Parkway between Boulder Highway and the Lake Mead Recreation Area (Near Warm Springs Road, Athens Avenue, and Golda Way) from 8:00 p.m. Friday evenings through 5:00 a.m. Monday mornings. Motorists are advised to use caution in the work zone.

Cheyenne Avenue Repaving Project
Contract: 3383 - Las Vegas Paving - $9,677,150.00
Cheyenne Avenue from US 95 to Losee Road and from Civic Center Drive to Nellis Boulevard. Cold mill and place plantmix bituminous surface with open-grade, restripe from 4 to 6 lanes including median island, signal modifications and right turn lanes.
Project Start: August 2009 - Estimated Completion: June 2010
Lane closures will be in effect on Cheyenne Avenue between US-95 and Nellis Boulevard Sunday through Thursday evenings from 9:00 p.m. to 5:00 a.m. each evening.Motorists are advised to use traffic controls as directed



Widen Saint Rose Parkway to eight lanes (Phase 2B)
Contract 3361, Southern Nevada Paving $6,583,666.05
Traffic on Saint Rose Parkway at I-215 has been switched to the west side of the road. Paving operations are expected to continue through February and will resume for the final paving when temperatures allow for open grade paving. Motorists are advised to use lane shifts and caution in the work zone.

I-15 Southbound Paving from Mile Post 17 to California State Line
Contract 3397 ARRA-015-1(140): Fisher Sand & Gravel Company - $7,333,333.33
Project Start: Spring 2010 Estimated Completion: Fall 2010
No impacts on traffic at this time. Project Start scheduled for Feb or Mar 2010.

NDOT MAINTENANCE
NHP: Current Road Closures and Incidents
NHP Current Road Closures and Incidents

Emergency Road Conditions
Nevada Emergency Conditions

Nevada and Other State Road Condition Contact Information
Nevada 511 Travel Information Web Site For road condition information for the State of Nevada you may call 511

California: (800)427-7623
Arizona: (888)411-1623
Utah: (866)511-8824
Oregon: (503)588-2941


The O'Callaghan/Tillman Bridge - Construction Delays
Due to construction activities and public safety, traffic on US 93 at the Hoover Dam may be reduced to single lane in each direction in the evening hours. Motorists are advised to observe traffic controls and use extreme caution in the work zone.

On Monday, Feb. 8 at 11 a.m., blasting will take place at milepost 2.7. Motorists can expect hour long travel delays until 4 p.m. Please plan accordingly and use an alternate route when possible.

On Wednesday, Feb. 10 at 11 a.m., blasting will take place at milepost 2.7. Motorists can expect hour long travel delays until 4 p.m. Please plan accordingly and use an alternate route when possible.

Crews are continuing paving operations along the new southbound alignment of US 93. Paving operations will start at milepost 17 and move north through the project to milepost 10. Paving of this phase is anticipated to be complete by March 31, 2010. Motorists can expect 15-minute delays during interim asphalt deliveries.

Hoover Dam Traffic Controls - Bureau of Reclamation 1-888-411-7623
Restrictions on enclosed, commercial semi-trucks (18-wheelers), tanker trucks and all other enclosed trucks remain in effect. For more information on vehicle restrictions call the Bureau of Reclamation at 702-293-8420 or their website at http://www.usbr.gov/lc/hooverdam/crossingguide.pdf

Media Traffic Reports for the Las Vegas Area
Fox 5 Traffic

Channel 8 KLAS-TV Traffic

KVBC NEWS 3 Real Time Traffic

Channel 13 KTNV Problem Solver Traffic

Las Vegas Review Journal Traffic and Transportation

CALTRANS DISTRICT 8 ROAD INFORMATION
Link to CALTRANS District 8

For road condition information in Southern California call 800-427-7623 .

Links to NDOT Projects and Corridor Studies in Southern Nevada
Boulder City Bypass

Hoover Dam Bypass

I-15 North Design-Build Project

I-15 South Corridor Study

I-515 Corridor Study

I-15 Project Neon

Pioneer Program

SOUTHERN NEVADA LINKS TO LOCAL AREA ROAD CONSTRUCTION REPORTS
Clark County's Road Construction Projects

City of Las Vegas Road Construction Projects

RTC's FAST Traffic Cameras for the Las Vegas Area

Las Vegas Area Construction

Disclaimer:
NDOT provides information on road conditions as a public service. This information is published automatically and cannot be guaranteed as to accuracy or timeliness. This information depends on a number of items, including Internet availability, communications networks, and computer equipment which are beyond the control of the NDOT and difficult to predict.

Listing of roadway snow and ice conditions is not a guarantee that NDOT has plowed or sanded all of these locations for travelers. Plowing and sanding is generally done to different roads on a basic priority system but that the actual determination of the amount and timing of sanding and plowing of any particular section of highway is up to the judgment of local road maintenance officials based on their experience and local conditions at particular times.

Weather and road conditions change rapidly, and drivers are in the best position to perceive such conditions and adjust their driving accordingly. Those relying on this information do so at their own risk, and neither the State of Nevada, the NDOT nor any of their employees or agents shall be liable for either the accuracy of this information nor any actions taken in reliance thereon.



1263 South Stewart Street, Carson City, Nevada 89712 - Telephone: 775-888-7000 - Fax: 775-888-7115 - Email: info@dot.state.nv.us
Copyright © 1998 - 2010 Nevada Department of Transportation
Valid HTML 4.01! Valid CSS!