Skip past header
Nevada Department of Transportation Go to State of Nevada Homepage
Jim Gibbons
Governor
Susan Martinovich, P.E.
Director
 

Search Geotechnical Reports


Search for the following characters in any field:

 
Search Examples: I-80, Carson, US...


Please click on the date to retrieve the report:

Date Contract
Number
EA
Number
Description
Counties
September 1995 Alignment Study and Pavement Design Southern Segment, Las Vegas Beltway, Section 6.
Clark 
February 1996 Alignment Study and Pavement Design Southern Segment, Las Vegas Beltway, Section 6.
Clark 
May 2008 72857 I-80 / Nevada Pacific Parkway Interchange, Fernley, Nevada.
Lyon 
August 2008 73445 US 95A Seismic Refraction Survey Rippability Study.
Lyon 
July 2008 I-515 Northbound Soundwalls Las Vegas, Nevada.
Clark 
April 2000 I-15, UPRR-G790 Structure Replacement, Las Vegas Nevada.
Clark 
August 1992 Desert Inn Superarterial.
Clark 
October 2006 I-215 Airport Connector Load Test Report.
Clark 
August 2008 3360 73332 B-89 Bridge Replacement SR-170 over the Virgin River Mesquite, Nevada.
Clark 
September 2008 73274 Pavement Distress Geotechnical Report SR 430 (US 395) Milepost WA 8.57 TO WA 11.70.
Washoe 
August 2000 3292 70964 Bowers Mansion Road Interchange, I-580 & US 395, Washoe Valley. Geotechnical Report.
Washoe 
May 2005 Consultant’s Report Corrosion Evaluation of MSE Walls I-515 Flamingo Road Las Vegas. NDOT Agreement No. P068-04-020.
Clark 
April 2009 3388 60337 Wildlife Overpass Across US 93 Near Wells.
Elko 
March 1996 Assessment Of Rock Slope Conditions Along Kingsbury Grade Road – SR 207.
Douglas 
July 2000 3044 72411 US 95 At Durango Drive Interchange Las Vegas.
Clark 
November 2004 72781 Grade Separation (H-2287) Koontz Lane At US 395/I-580.
Carson City 
January 2006 73171 I-15 Sign Bridges
Clark 
June 2009 73005 US 395 Northbound Widening Moana Lane to I-80 (Spaghetti Bowl).
Washoe 
July 2009 3409 73451 US 95 Widening Rainbow Boulevard to Ann Road - Ann Road Structures
Clark 
July 2009 3408 73523 US 93 Wildlife Undercrossings North of Wells, Nevada
Elko 
December 2009 73524 US 93 Wildlife Overcrossing at HD Summit. North of Wells, Nevada
Elko 
October 1975 1638 70304 Gowan Road Grade Separation (H-1217), Rainbow Expressway, Las Vegas, Nevada
Clark 
May 1999 2996 72357 Washington Avenue, Grade Separation Widening (H-1211)
Clark 
June 8, 1999 2996 72356 US 95 at Smoke Ranch Road In Las Vegas, Structure No. H-1214
Clark 
December 19, 1988 2458 71592 Cheyenne Avenue Interchange I-1216 & Craig Road Interchange I-1219
Clark 
March 1, 1995 2727 71866 Converse Consultants Southwest Inc., Geotechnical Exploration, Rancho Drive/Ann Road and U.S. 95 Interchange, Las Vegas, Nevada
Clark 
June 2, 1989 2349 71592 Western Technologies, Inc., Geotechnical Exploration, Proposed Interchanges at Cheyenne Avenue, Alexander Road and Craig Road, Oran K
Clark 
June 2000 3038 60093 U.S. Highway 95, Project 1A Widening, Rainbow Boulevard to Cheyenne Avenue, Las Vegas
Clark 
November 2000 3055 60103 U.S. Highway 95 Project 1B Widening, Cheyenne Avenue to Craig Road, Las Vegas, Nevada
Clark 
November 2002 3161 60158 U.S. 95 Widening Project, 2C and 2D Retaining Walls
Clark 
October 2008 3389 60385 I-580 Meadowood Complex Improvements Reno, Black Eagle
Washoe 
August 2005 3400 72781 Carson City Freeway Phase 2B, Black Eagle
Carson City 
December 19, 1988 2349, 2387 71478, 71592 Lake Mead Blvd Interchange I-1213, Vegas Drive Grade Separation H-1212, & Smoke Ranch Road Grade Separation H-1214
Clark 
August 2005 72781 South Carson Street Interchange, Carson City Freeway Phase 2B, Black Eagle
Carson City 
February 1994 2634 71713 Rock Slope Study on SR 160, Pahrump Valley Road, Milepost SR-160-Cl-18.2 to 21.42
Clark 
February 1976 1587 70716 Truckee River Bridge at Lockwood B-1490
Storey, Washoe 
December 2, 2008 3366 73423 Geotechnical Data Report, Interstate-15 South Design Build. Kleinfelder
Clark 
March 10, 1989 2727, 2349 71853, 71478 US 95 Grade Separations at Lone Mountain Rd & Alexander Rd, Las Vegas
Clark 
December 9, 2009 3416 73484 Geotechnical Information for SR 227 at Spring Creek/Licht Parkway
Elko 
March 19 & 20, 1996 2796 72269 Nevada Department of Transportation, Boring Field Logs, US 95 Sound Walls, Washington Avenue to Vegas Drive
Clark 
2009 3409 73451 Nevada Department of Transportation, Test Cut Logs and Laboratory Test Results, US 95 Widening, Package 1 (West Washington Avenue to Ann Road & Durango Drive)
Clark 
2009 3409 73451 Nevada Department of Transportation, Boring Logs and Laboratory Test Results, US 95 Widening, Package 1 (West Washington Avenue to Ann Road & Durango Drive)
Clark 
November 2009 Investigation of Corrosion of MSE Walls in Nevada (Draft), University of Nevada, Reno, Research Report No. 2009-03.
 
July 2008 73326 SR 160 Durango Drive to Red Rock Canyon Road, Soil Testing Report
Clark 
December 2002 3247 72495 I-15/SR 160 Blue Diamond Interchange, Las Vegas, Clark County Nevada
Clark 
April 2002 3118 72648 Pembroke Drive Bridge Replacement
Washoe 
April 2007 3411 73311 Site Conditions for US 395 Traffic Cable Barrier Installation Project From 0.19 Miles North of Muller Lane to 0.18 Miles South of Topsy Lane
Douglas 
June 29, 2010 73560 Geotechnical Investigation Interstate 80 - Pilot Peak to State Line (EA# 73560) Cable Barrier Installation
Elko 
July 2010 73553 Baseline Geotechnical Report I-15 Milepost CL120 Interchange Design Build Mesquite, Nevada
Clark 
August 2010 73587 SR 160 Cable Barrier Installation Milepost CL 21.89 TO NY 0.97, Pahrump, Nevada
Clark, Nye 
December 2003 72781 Carson Freeway Clearview Drive Grade Separation US 395 Phase 2B Geotechnical Report.
Carson City 
August 2004 3327 72781 Carson Freeway Fairview Drive Interchange US 395 Phase 2A Geotechnical Report.
Carson City 
July 2006 72495 Warm Springs Grade Separation I-15 Geotechnical Report.
Clark 
April 2003 3383 73086, 73161 Cheyenne Avenue SR 574 Distress Investigation and Mitigation Geotechnical Report.
Clark 
August 2006 3323 72789 Railroad Grade Separation G-2845 US 50A at Hazen Geotechnical Investigation Report.
Churchill 
July 2005 3327 72781 Carson Freeway Fifth Street Grade Separation US 395 Phase 2A Geotechnical Report.
Carson City 
February 2004 3324 72495 SR 160 Blue Diamond Road U. P. Railroad Grade Separation Geotechnical Report.
Clark 
July 2004 3324 72495 SR 160 Blue Diamond Detention Basin Material Investigation with Test Results.
Clark 
November 2000 3133 72423 Bridge B-2352 Replacement at Hafed Geotechnical Investigation Report.
Storey, Washoe 
September 2005 3319 72992 Virgin River Bridge B-85 Replacement SR 170 at Riverside Geotechnical Report (Revised).
Clark 
March 2004 3270 72498 US-95 at Piute Wash Structure B-420 S Geotechnical Report.
Clark 
January 2008 3310 Logan Creek Drive Cut Slope, Rock Scaling Recommendations Geotechnical Report.
Douglas 
May 2008 73363 Summerlin HOV Flyover Bridge US 95 Widening Project.
Clark 

You will need the Adobe Acrobat Reader plug-in to download and view the files on this site. If you don't have the plugin, you can download the plugin by clicking on the Get Acrobat Reader button here.

Get Adobe Acrobat Reader


This page has been visited 4885 times.



1263 South Stewart Street, Carson City, Nevada 89712 - Telephone: 775-888-7000 - Fax: 775-888-7115 - Email: info@dot.state.nv.us
Copyright © 1998 - 2010 Nevada Department of Transportation
Valid HTML 4.01! Valid CSS!