Annual Work Program

Print
Press Enter to show all options, press Tab go to next option

Work Program Transportation Projects

MOUNTAIN CITY HIGHWAY AWP Page PhotoThe Work Program satisfies Nevada Revised Statute (NRS) 408.203 requiring the Director of NDOT to submit a 3 and 10 year list of transportation projects to the State Legislative Council Bureau (LCB) every even year, and the State Legislature every odd year.

Projects in the Work Program are sorted by county with each of the seventeen (17) counties represented with its own section and a section for the Tahoe MPO (TMPO).

The Work Program is composed of three elements:

  • The Work Program (WP) lists the current fiscal year projects to include the betterment and rehabilitation projects completed by state forces and district contracts.
  • The Short Range Element (SRE) lists projects state and local entities would like to initiate within the next 2 to 3 years.
  • The Long Range Element (LRE) lists projects in the planning stage or extensions of current projects to be completed in 4 to 10 years.

It also includes certain elements from the currently published Transportation System of Projects (TSP) (See Inputs to the TSP diagram) excluding transit and regionally significant non-Federal projects.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer