Your ability to get to and from where you need to go in Mesquite and along the I-15 corridor is important. That’s why we provide the following information to help you get where you need to go.

Construction Updates

From March 21st at 7:00 a.m. to April 6th at 9:00 p.m., traffic in both directions on Falcon Ridge Parkway is scheduled to be directed from the west side of the roadway to the east side of the roadway to accommodate construction.Motorists are encouraged to use caution and to carefully observe traffic signs and message boards in the area.

 

For the latest information on other major southern Nevada road construction projects, click on the link below. 

Mesquite Project Featured in Civil Engineering Magazine

The West Mesquite Interchange Design-Build Project was featured in the March 2012 edition of Civil Engineering magazine. View the article here.