Construction Quality Assurance Forms

Quality Assurance Forms

Available Forms
       Material Deposit Usage Report 040-087 
 Absorption and Specific Gravity for Coarse and Fine Aggregates, 040-023   Moisture-Density Determination, Compaction Report (Proctor), 040-069 
 Absorption and Specific Gravity for Fine Aggs, 040-023A   Nuc Gauge Worksheet for Control Strip Density, 040-048 
 Absorption and Specific Gravity for Coarse Aggs, 040-023B    Nuclear Compaction Report for Soils and Aggregates, 040-007 
 Acceptance Testing Frequency Report, 040-075   Nuclear Gauge - Sand Cone Check Test, 040-003 
 Bulk Gravity and Density of Compacted PBS, 040-017B   Nuclear Gauge - Sand Cone Correlation, 040-026 
 Compaction Report, 040-004   Nuclear Thin Layer Compaction Report, 040-017 
 Compaction Report for PBS Drilled Core Data, 040-018   Nuclear Thin lift Correction Factor Worksheet, 040-017A 
 Concrete Evaporation Rate and Cure Monitoring, 040-024   Pavement Core Record, 040-064 
 Continuous Pile Driving Record (metric), 040-059   Pavement Marking Film Adhesion Test, 040-047 
 Continuous Pile Driving Record (english), 040-059A   Plant Calibration Worksheet, 040-038 
 Contractor Traffic Log, 040-012   Pull-Off Test for Polymer Concrete, 040-063 
 Daily Biological Field Report, 040-088    Report of Calibration Factor (Including Weekly Checks) Using the Ignition Furnace Method, 040-053 
 Daily Construction Report, 040-056    Report of Calibration Factor with RAP (Including Weekly Checks) using the Ignition Oven Method, 040-053A 
 Daily Diary Electronic (English), 040-056A    Report of Field Tests of Coarse and Fine Aggregate for Concrete, 040-035 
 Daily Diary Report, 040-056A    Report of Profilograph Test, 040-073 
 Daily Hotplant Worksheet, 040-045    Report of Tests of Portland Cement Concrete Pavement, 040-016 
 Daily Plant Report of Asphalt Mixtures, 040-011    Retroreflectivity Measurements, 040-041 
 Daily Report for CTB Mixture, 040-052    Ride Lot Columnar Pad, 040-084 
 Daily Report of Tests Made in Field, 040-010    Ride Lot Pay Summary Sheet (english) (Hdqtrs), 040-082 
 Dowel Bar Placement Worksheet, 040-019    Rock Compaction Inspection Report, 040-027 

 Drilled Shaft Inspection Report, 040-060   

 Safety Inspection Checklist (Hdqtrs), 040-028 
 Emulsion Viscosity Worksheet (chip seal and cold-recycle), 040-032   Sand Density Calculation, 040-068 
 Field LL-PI Worksheet, 040-014    Striping Paint Thickness Report, 040-021 
 Field Material Sieve Sheet, 040-013   Theoretical Maximum Specific Gravity of Bituminous Paving Mixtures (Field Method), 040-030 
 Field Material Sieve Test-Bituminous ratio By Ignition Method, 040-050    Transit Mix Concrete Delivery, 040-025 
 Field Report for CTB Strength Tests, 040-051   Transmittal for Concrete Samples, 020-017 
 Field Sand Equivalent Worksheet, 040-006    Vehicle Weight Limit 040-000 
 Foundation Piling Driving Record, 040-058   Water Volume Calculations for Sand Cone Apparatus and Measuring Vessel (Hat), 040-067 
 Inventory of Testing Equipment, 040-020   Weekly Site Discharge Insp. Checklist, 040-054 
   Workzone Traffic Control Checklist, 040-056B